Hot Fluid Applied
• HRA can only be applied to concrete that has been cured for 7 to 28 days.
• These membranes are applied by roller or squeegee.
• Material is melted at 400 F in a double-jacket kettle and poured onto the deck
• Applied with primer in two lifts fabric reinforced. 1st lift 90 mils, 2nd lift 125 mils
• Fluid applied membranes should meet CANGSB 37-50.
• Cures immediately.