FDIC – L. William Seidman Center Green Roof | Arlington, VA
In 2005, the Federal Deposit Insurance Corporation (FDIC) adopted a new objective— To evaluate & measure the operational energy conservation of its Virginia Square facility and identify opportunities to further conserve energy and reduce utility costs. OVERVIEW The campus at the heart of George Mason University consists of an…
Baltimore Convention Center | Baltimore, MD
OVERVIEW The original project scope of the Baltimore Convention Center called for the replacement of the existing roof membrane due to membrane failure and subsequent leaking into the Convention Center’s main halls below. Once the site was studied, the Barrett Company suggested that the Convention Center take advantage of the opportunity to…
Fort Knox Bullion Depository | Fort Knox, KY
To see the full project profile, click the link below: Fort Knox Bullion Depository Project Profile Location: Fort Knox, KY Job Size: Building Owner: United States Mint Roofing Contractor: Swift Roofing 108 South Park Circle Valley Creek Business Center Elizabethtown, KY 42701 800-844-4920 • 800-844-4921 Can you imagine the weight of about 125 semi-trucks,…
Fenimore Art Museum | Cooperstown, NY
To see the full project profile, click the link below: Fenimore Art Museum Project Profile JOB DETAILS: 1994 Location: Cooperstown, NY Job Size: 38,100 sq. ft. Architect: Beth Loftus + Peter Ogman Hardy Holzman Pfeiffer Associates (Now Pfeiffer Partners) Contractor: Charles T. Driscoll Masonry Restoration Co., Inc. 4562 Jordan Rd. Skaneateles Falls,…
Paramount Plaza | New York, NY
To see the full project profile, click the link below: Paramount Plaza Project Profile 1992 Location: New York, New York Roofing Contractor: C & W Roofing Architect: Der Scutt In 1992, a major renovation program was conceived by none other than Der Scutt, the architect responsible for a number of downtown New…
The Residences at Belle Square | La Crosse, WI
Belle Square is a dynamic complex integrating four main components: residential, office, retail and parking in the center. The building, designed by The Kubala Washatko Architects, responds to complex site and program challenges, including requirements for drive-thru banking, retail parking demands, constrained vehicle ingress/egress, and phased construction of project components. A vibrant community…
550 Madison Ave | Manhattan, NY
Known to many as the Sony Tower and before that as the AT&T Building, the famed landmark skyscraper standing at 550 Madison is one of the latest to see a major renovation. THE EARLY CONTROVERSY OF 550 MADISON Originally completed in 1984, the structure by Philip Johnson & John Burgee became a lightning rod as…
LinkBelt Construction Equipment – Facilities Building Roof Restoration | Lexington, KY
“Restore & Repair So You Don’t Have to Replace” After evaluating the roof of their 240,000 sq/ft facilities building, the management team at LinkBelt Construction Equipment did just that. Thanks to Barrett’s Ram Cold Tar® Plus roof restoration & repair system & Ram Ultra-Silver® reflective aluminum finish, the result was a new,…